Peak Power signed an 11-year shared savings agreement with Starlight Investments in 2018. The shared savings agreement minimized risk for the building owner and freed up capital for alternative capital projects.
A battery energy storage system (BESS) was installed at Bloor Islington Place, one of Starlight Investment’s premier commercial office buildings. Peak Power was responsible for procuring the battery, submitting utility interconnection documents, and providing an engineered solution that located the BESS in a previously unused outdoor location.
Similar to one of our other downtown Toronto projects, Peak Power was required to manage the subway running nearby (Islington stop) and obtain permission from the Toronto Transit Commission (TTC) to build.
"We are delighted to be one of Canada's first commercial building owners to install behind-the-meter energy storage… Innovative technology such as energy storage and Peak Power's software are providing options to building owners for better ways to manage our day-to-day energy needs."