Bloor Islington Battery Storage Project

Bloor Islington Battery Storage Project

Commercial Project, Building Optimization

Summary

Starlight’s building is connected to the Islington Subway station (part of the Toronto Transit Commission public transit network). This state-of-the-art Class A office building hosts tenants like the Ministry of Education and Moneris.

The building owners looked for solutions to reduce demand charges (Global Adjustment) and turned to Peak Power for guidance. We installed a 500 KW system to help slash demand charges by 25%.

Peak Power was able to achieve energy cost reduction and revenue generation through global adjustment savings and contributions to demand response.

Customer

Starlight Investments

Location

Toronto, Ontario

Activation

Q3 2018

Capacity Size

500 kW / 1000 kWh

No-Cost Energy Storage Solution

Peak Power signed an 11-year shared savings agreement with Starlight Investments to install an energy storage unit (ESU) to target Ontario’s peak demand electricity charges at Bloor Islington Place, one of their premier commercial office buildings.

The shared savings agreement minimized risk and freed up capital for alternative capital projects. Peak Power was responsible for procuring the energy storage unit (ESU), submitting utility interconnection documents, and providing an engineered solution that located the ESU in a previously unused outdoor location.

READ MORE

Results

Similar to one of our other downtown Toronto projects, Peak Power was required to manage the subway running nearby (Islington stop) and obtain permission from the Toronto Transit Commission (TTC) to build.

Peak Power was able to achieve energy cost reduction and revenue generation through global adjustment savings and contributions to demand response.

READ MORE

Energy Cost Savings

~$440,000

To date

Developed in partnership with

"We are delighted to be one of Canada's first commercial building owners to install behind-the-meter energy storage…Innovative technology such as energy storage and Peak Power's software are providing options to building owners for better ways to manage our day-to-day energy needs." 

Perry Rose
Starlight Investments