• 401 West Mall Battery Storage Project

    401 West Mall Battery Storage Project

    Energy Storage

    This commercial office building located in Etobicoke has an energy storage system installed to lower electricity bills through participating in demand response programs, peak shaving and Global Adjustment reduction.

    See More
  • Peak Drive Pilot Project

    Peak Drive Pilot Project

    Electric Vehicle Integration

    The Peak Drive project is one of the largest vehicle-to-grid demonstration projects globally, with 21 bi-directional chargers and Nissan LEAF vehicles in 3 commercial office buildings in downtown Toronto. This showcase system uses an electric vehicle and energy storage system to reduce the customers’ demand charges.

    See More
  • 150 Bloor Street West Commercial Building Optimization Project

    150 Bloor Street West Commercial Building Optimization Project

    Building Optimization

    Powered by our Peak Synergy software, our Building Intelligence Platform (BIP) uses real-time data captured by sensors that feed into the predictive analytics to generate instantaneous alerts, allowing commercial building optimization strategies for building operators.

    See More
  • 95 St. Clair West Building Optimization Project

    95 St. Clair West Building Optimization Project

    Building Optimization

    This building optimization project was completed for 95 St Clair Avenue West, a 16-storey commercial office building serviced by Colliers International with Canadian cooperative The Desjardins Group – the largest federation of credit unions in North America – as their primary tenant.

    See More
  • Westchester Multiple Battery Storage Project

    Westchester Multiple Battery Storage Project

    Energy Storage

    For a Westchester customer, Peak Power delivers ICAP and delivery charge savings with behind-the-meter battery storage and Peak Synergy

    See More
  • Kearny Mesa Innovative Battery Storage Project

    Kearny Mesa Innovative Battery Storage Project

    Energy Storage

    This innovative battery storage project is believed to be the first project of its kind to operate under FERC Order 841 and the CPUC’s Decision on Multi-Use Applications.

    See More
  • Saturn Power Storage Project

    Saturn Power Storage Project

    Energy Storage

    Saturn Power's Storage Project is located at a nuclear generation facility in Ontario, Canada. Peak Power operates and optimizes the energy storage system to reduce grid dependency during peak periods and, as a result, reduce electricity costs. The Saturn battery operates for global adjustment, demand response, and price arbitrage.

    See More
  • Bloor Islington Place Battery Storage Project

    Bloor Islington Place Battery Storage Project

    Energy Storage

    For this energy storage project at Bloor Islington Place, Peak Power provides peak prediction and asset dispatch services. We also optimize the battery for demand response events.

    See More