This building optimization project was completed for 95 St Clair Avenue West, a 16-storey commercial office building serviced by Colliers International. Canadian cooperative The Desjardins Group – North America’s largest federation of credit unions – is their primary tenant.
After just one year of operation, our client realized a 12% reduction in their electric bill and offset 18.5 Metric Tons of C02e. Equipment optimization resulted in a 10% reduction or 340 hours. Savings verified by Save on Energy and the Independent Electricity System Operator (IESO)
With the help of Peak Power’s software, the building achieved a BOMA BEST Platinum Certification and a National and International TOBY Award for Building of the Year in 2019
Contact us about your project needs, or if you have a question about your current energy storage asset optimization.
© 2016-2024 Peak Power Inc. All Rights Reserved. Terms & Conditions | Privacy Policy | AODA Statement